
Client Name
Park JiyeonProject Value
₩2,400,000Date
20 Nov 2023Whole-Home Line Upgrade
Full replacement of the main water supply line from the street connection to all internal branch points. The original 1980s copper line had developed pinhole leaks in three locations, causing intermittent low pressure and water staining in two rooms.
The upgrade involved open-trench work in the front yard, new meter connection, and full interior branch replacement. All work was permitted and inspected. The homeowner saw immediate pressure improvement and received a 10-year workmanship guarantee upon completion.


Our work process
Leak Detection
Non-invasive acoustic detection to locate all leak points before excavation.
Permitted Work
All major line work is fully permitted and inspected by city officials.
Guaranteed Finish
Written 10-year workmanship warranty provided on all line replacements.

3 comments
Absolutely outstanding work! The team was professional from start to finish. The results exceeded our expectations.
Really impressed by the quality of this project. The attention to detail is remarkable and everything was completed on schedule. Highly recommend NearHelp!
Great experience working with the team. They explained every step of the process and left the area spotless after finishing. Will definitely hire again.